top of page

Working with Shell Upstream Americas

Three years ago, Shell appointed Hytech to develop the different engineering stages of the Sierras Blancas / Cruz de Lorena shale oil grassroots early production facilities (EPF). After design approval, Hytech and SIMA executed the project and the EPF was successfully started up by the end of 2016.

In 2018, Shell decided to move forward towards a Central Production Facilities (CPF) and again appointed Hytech to develop the Conceptual Engineering of the different stages expected for the Sierras Blancas / Cruz de Lorena CPF.

Additionally, Hytech was awarded the Extended Basic Engineering to carry out modifications to the existing EPF.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • LinkedIn Icon App
bottom of page